Architectural Alignment
Final placement matched room geometry and visual balance.
Case Study 03
A high-finish wall-mounted display deployment with clean cable routing and long-term serviceability built in.
Representative project summary. Client-identifying details are intentionally anonymized.
Metrics
Final placement matched room geometry and visual balance.
Routing strategy preserved clean walls and service access.
Documentation and labeling reduced future maintenance time.
Project Context
Approach
We validated stud position, mount load paths, and viewing angles before drilling to avoid rework and ensure long-term structural confidence.
Signal routing and power planning were designed around concealment and accessibility so the final result looked clean without sacrificing maintainability.
Final leveling, calibration, and documentation were completed to support both immediate use and future expansion.