Case Study 03

Precision Display Integration

A high-finish wall-mounted display deployment with clean cable routing and long-term serviceability built in.

Representative project summary. Client-identifying details are intentionally anonymized.

Metrics

Deployment Outcomes

Architectural Alignment

Final placement matched room geometry and visual balance.

Concealed Cable Paths

Routing strategy preserved clean walls and service access.

Faster Future Service

Documentation and labeling reduced future maintenance time.

Project Context

Role, Constraints, Outcome

Approach

How THWS executed

We validated stud position, mount load paths, and viewing angles before drilling to avoid rework and ensure long-term structural confidence.

Signal routing and power planning were designed around concealment and accessibility so the final result looked clean without sacrificing maintainability.

Final leveling, calibration, and documentation were completed to support both immediate use and future expansion.